kanban 설정 주요 t-code

sapjoy 2018.12.27 10:08 조회 수 : 751

kanban 설정 주요 t-code

 

PK13N

PK12N - KANBAN STATUS CHANGE

 

KANBAN is having two master data.

1.    Control cycle

2.    Supply area

First of all supply area will be created with storage location and responsible person.

T code PK05. Put the plant and create new entry.

Put storage location and responsible person and save the data.

Go to MMSC

Exclude the storage location from planning(as this is not required to plan through MRP). We can exclude the storage location from customizing also. In this case all the material in the storage location will be excluded for planning.

Now the control cycle has to be created.

T code PK01

Put material, plant, supply area and select classic KANBAN.

Put no of KANBAN (means no of  bins), No of KANBAN quantity and maximum empty allowed.

Select production type also (inhouse/external).

This can be done through control cycle maintenance also. T code PKMC. To create new click on  

Now check MD04 screen

Total stock is 63 and is excluded from MRP. This stock will be consumed in subsequent stage(in next stage)

Now check the status of the KANBAN bin. T code PK13N

Here three bins are full and two bins are in Wait status. Click    to see the legends.

Two important status of KANBAN is.

If Bins are made full- GR will be done

If Bins are made empty-Procurement proposal will be created (NOT GI WILL BE DONE)

GI is being done through backflush.

In actual situation bins are being scanned through RF device and scanning is being done one the Bins are empty or Full.

But here we will do through this tab.

Let’s select one bin and make it empty by 

One KANBAN processed and Bin became RED. This means Bin is empty.

Now check MD04. One Production order created (as empty means one proposal will be created).

Make another Bin empty is same process and see MD04 screen.

Release both the order. The order type of KANBAN is PP05.

Double click on the Bin and you can see the details with order created.

Check the stock in MMBE

Stock is 63. Now select one empty Bin in make it Full 

The Bin became green.

Check the stock

Its become 70 unrestricted. Hence 7 nos GR is happened.

Repeat the process and check the qty .More 7 no GR happened

Check MD04. No proposal exist (for all orders GR happened).

Few more useful T codes

PK11: Plant overview.

PK18: For each material production order, DOC no on which the production order got posted can be seen. Status of KANBAN container will be displays also.

PK31: Error in KANBAN can be checked. Select any error line and click on Bell. You can change the error status.

PK09: KANBAN can be locked (when the KANBAN is not is used/Bin is damaged).

 

SOURCE : https://blogs.sap.com/2014/01/06/kanban-execution-step-by-step-approach/

번호 제목 글쓴이 날짜 조회 수
37 계획오더 수동생성, MRP 생성 구별여부 [2] sapecc6 2021.10.28 848
36 sap mrp2 view co-product 는 언제 체크합니까? [2] sapabaper 2020.04.20 806
35 MRP 실행 관련 질문 _ PP [2] file 토마토 2021.11.25 787
34 생산 오더 생성시 BOM 복사 관련 문의 [1] magicinside 2018.10.10 786
33 PP 원자재 추가 투입 관련 문의드립니다 ㅠ [2] 아밥자 2019.01.09 780
32 생산오더 Delivery Completed SAPSAP 2020.08.25 775
» kanban 설정 주요 t-code [1] sapjoy 2018.12.27 751
30 Process order 화면 Screen Exit 모포 2018.05.18 734
29 Process order 예약요청 수량 변경 문의 바이민 2018.03.26 729
28 Routing 저장시 걸리는 Exit이나 Badi 아시는 분 있나요? 푸딩딩 2018.03.08 712
27 BOM 삭제시 삭제 취소 가능한가요? devilston 2018.12.07 684
26 PP 모듈 배치관리 해제 [1] 문사장님 2019.02.27 683
25 PP_ 2개 공정 동시 시작 설정 file PP_MRP_Controller 2020.09.11 680
24 PP쪽은 스탠다드 처리를 함수로 안하나요? [3] 로우랜즈 2022.01.03 673
23 작업장이 변경됐는데 라우팅/생산버전 일괄 삭제가 가능할가요? [1] 아좀더 2021.06.29 662
22 pp 점검 리스트? sap는어려워 2019.03.18 636
21 이미 생성된 bom의 내부 자재들의 스크랩을 변경할 수 있나요?? [1] 가방 2018.09.12 615
20 해체 작업지시 방법 [1] 요셉82 2018.11.29 597
19 계획오더 PLAF 삭제 이력 확인 방법 [7] 아좀더 2022.12.15 552
18 pp - mrp 실행시 Delivery Schedules 옵션은 언제 쓰는건인가요? [2] sapabaper 2020.05.04 546