메뉴 건너뛰기

SAP 한국 커뮤니티



kanban 설정 주요 t-code

sapjoy 2018.12.27 10:08 조회 수 : 752

kanban 설정 주요 t-code

 

PK13N

PK12N - KANBAN STATUS CHANGE

 

KANBAN is having two master data.

1.    Control cycle

2.    Supply area

First of all supply area will be created with storage location and responsible person.

T code PK05. Put the plant and create new entry.

Put storage location and responsible person and save the data.

Go to MMSC

Exclude the storage location from planning(as this is not required to plan through MRP). We can exclude the storage location from customizing also. In this case all the material in the storage location will be excluded for planning.

Now the control cycle has to be created.

T code PK01

Put material, plant, supply area and select classic KANBAN.

Put no of KANBAN (means no of  bins), No of KANBAN quantity and maximum empty allowed.

Select production type also (inhouse/external).

This can be done through control cycle maintenance also. T code PKMC. To create new click on  

Now check MD04 screen

Total stock is 63 and is excluded from MRP. This stock will be consumed in subsequent stage(in next stage)

Now check the status of the KANBAN bin. T code PK13N

Here three bins are full and two bins are in Wait status. Click    to see the legends.

Two important status of KANBAN is.

If Bins are made full- GR will be done

If Bins are made empty-Procurement proposal will be created (NOT GI WILL BE DONE)

GI is being done through backflush.

In actual situation bins are being scanned through RF device and scanning is being done one the Bins are empty or Full.

But here we will do through this tab.

Let’s select one bin and make it empty by 

One KANBAN processed and Bin became RED. This means Bin is empty.

Now check MD04. One Production order created (as empty means one proposal will be created).

Make another Bin empty is same process and see MD04 screen.

Release both the order. The order type of KANBAN is PP05.

Double click on the Bin and you can see the details with order created.

Check the stock in MMBE

Stock is 63. Now select one empty Bin in make it Full 

The Bin became green.

Check the stock

Its become 70 unrestricted. Hence 7 nos GR is happened.

Repeat the process and check the qty .More 7 no GR happened

Check MD04. No proposal exist (for all orders GR happened).

Few more useful T codes

PK11: Plant overview.

PK18: For each material production order, DOC no on which the production order got posted can be seen. Status of KANBAN container will be displays also.

PK31: Error in KANBAN can be checked. Select any error line and click on Bell. You can change the error status.

PK09: KANBAN can be locked (when the KANBAN is not is used/Bin is damaged).

 

SOURCE : https://blogs.sap.com/2014/01/06/kanban-execution-step-by-step-approach/

번호 제목 글쓴이 날짜 조회 수
237 Order Split - Usage in Production Orders [4] file 엠엠공유 2011.08.10 5964
236 PP Overview [29] file Brian 2009.12.16 5915
235 Master_Planning(동영상자료) [7] file 얼라려 2011.03.18 5901
234 Production order의 component의 commitment 필드 용도 [1] 쿠쿠 2011.03.25 5632
233 오래된 PP동영상 강의 자료(PP_Introduction) [7] file 얼라려 2011.03.18 5587
232 오더생산과 반복생산의 차이분석 [1] 조우제 2007.08.30 5550
231 PP 테이블 요약 [22] file activeman 2008.02.05 5402
230 APO Livecache Monitoring 자료 [4] file mayoo 2011.02.15 5370
229 Production_Activity_control(동영상자료) [6] file 얼라려 2011.03.18 5315
228 PP module Certification 자료 구할수 있을까요? [3] 윤빤스 2010.10.07 5287
227 PP 써티 시험에서 APO 많이 나오나요? [3] Fjohnny 2011.06.09 5200
226 SAP PP Overview 자료 [13] file 서창리 2009.06.29 5182
225 백로그 문서와 취소문서 찾기 [15] file 거북이 2009.06.16 5120
224 자재마스터 생성시 마스터뷰에 대한 질문 [1] file 서륜파파 2012.10.25 5113
223 생산오더 릴리즈시 구성품목 구매요청 금지 방법 [11] file james07 2012.11.19 5109
222 PP 모듈관련 상세용어정리입니다,, [24] file 나야나 2008.04.10 5036
221 SCM자료 [16] file 스파이크 2009.02.05 4961
220 VC 관련 내용정리 [9] file V라인얼굴 2010.05.13 4958
219 표준공정하고 비율공정하고 차이점이 먼가요? [2] 서륜파파 2012.10.22 4942
218 mrp 스케쥴 [13] file kis 2010.02.06 4915