kanban 설정 주요 t-code
PK13N
PK12N - KANBAN STATUS CHANGE
KANBAN is having two master data.
1. Control cycle
2. Supply area
First of all supply area will be created with storage location and responsible person.
T code PK05. Put the plant and create new entry.
Put storage location and responsible person and save the data.
Go to MMSC
Exclude the storage location from planning(as this is not required to plan through MRP). We can exclude the storage location from customizing also. In this case all the material in the storage location will be excluded for planning.
Now the control cycle has to be created.
T code PK01
Put material, plant, supply area and select classic KANBAN.
Put no of KANBAN (means no of bins), No of KANBAN quantity and maximum empty allowed.
Select production type also (inhouse/external).
This can be done through control cycle maintenance also. T code PKMC. To create new click on
Now check MD04 screen
Total stock is 63 and is excluded from MRP. This stock will be consumed in subsequent stage(in next stage)
Now check the status of the KANBAN bin. T code PK13N
Here three bins are full and two bins are in Wait status. Click to see the legends.
Two important status of KANBAN is.
If Bins are made full- GR will be done
If Bins are made empty-Procurement proposal will be created (NOT GI WILL BE DONE)
GI is being done through backflush.
In actual situation bins are being scanned through RF device and scanning is being done one the Bins are empty or Full.
But here we will do through this tab.
Let’s select one bin and make it empty by
One KANBAN processed and Bin became RED. This means Bin is empty.
Now check MD04. One Production order created (as empty means one proposal will be created).
Make another Bin empty is same process and see MD04 screen.
Release both the order. The order type of KANBAN is PP05.
Double click on the Bin and you can see the details with order created.
Check the stock in MMBE
Stock is 63. Now select one empty Bin in make it Full
The Bin became green.
Check the stock
Its become 70 unrestricted. Hence 7 nos GR is happened.
Repeat the process and check the qty .More 7 no GR happened
Check MD04. No proposal exist (for all orders GR happened).
Few more useful T codes
PK11: Plant overview.
PK18: For each material production order, DOC no on which the production order got posted can be seen. Status of KANBAN container will be displays also.
PK31: Error in KANBAN can be checked. Select any error line and click on Bell. You can change the error status.
PK09: KANBAN can be locked (when the KANBAN is not is used/Bin is damaged).
SOURCE : https://blogs.sap.com/2014/01/06/kanban-execution-step-by-step-approach/
번호 | 제목 | 글쓴이 | 날짜 | 조회 수 |
---|---|---|---|---|
17 | CPIM 과 SAP PP 에 대한 문의 드립니다 [2] | 케이디맨 | 2011.02.15 | 6238 |
16 | Sales_&_Operatoin_Planning(PP 동영상자료) [6] | 얼라려 | 2011.03.18 | 6262 |
15 | SAP Overview & Master Data [28] | 서창리 | 2010.06.14 | 6323 |
14 | PP 유용한 링크 [4] | sapjoy | 2011.07.19 | 6383 |
13 | mrp guide [19] | 대디 | 2010.06.11 | 6393 |
12 | bom 에 관한 자료입니다. [pdf . 영어] [7] | Jenny | 2011.08.08 | 6468 |
11 | LTP 계획오더 img세팅 질문있습니다 [1] | geendy | 2021.05.23 | 6559 |
10 | sap 초보 질문드립니다.. ㅜㅜ(표준가 & 이동평균가) [5] | 샨티 | 2015.03.26 | 6609 |
9 | 생산전략 자료 [14] | 편대장 | 2011.03.08 | 6868 |
8 | SAP PP Configuration에 관한 자료입니다. [19] | Jenny | 2011.08.08 | 7034 |
7 | COGI(잘못된입고처리)잘못된 자재이동문제 [4] | 초코렛나무 | 2013.11.13 | 7462 |
6 | SAP WMS module 소개 자료 [11] | 로타르 | 2009.05.26 | 7644 |
5 | SAP 용어 정리(엑셀) [17] | 곰배 | 2009.10.14 | 8003 |
4 | 결산분개가 안되는이유? 생산오더 시작일을 과거로? [6] | 우깽 | 2013.07.05 | 8301 |
3 | ca01 routing 의 생산 투입시간 계산 공식 문의 [4] | 태원아빠 | 2011.10.06 | 8709 |
2 | 공장달력에 휴일 추가 [5] | imgood | 2013.09.24 | 10228 |
1 | 생산관리(PP Module) Routing [4] | 하얀천군 | 2007.11.02 | 10289 |
좋은 자료 감사합니다.